Planning a project that needs piling?
Contact us early and we will help you choose the right pile type and length.
We install piles for housing, industry, infrastructure and data centres, from single houses to thousands of metres of concrete and steel piles in one project. We help you choose pile type and length early, so the foundation is right from the start.
Piling is needed when the ground cannot carry a building's loads directly. Piles transfer the loads down to firmer soil layers or to bedrock.
Pile length depends on the ground, which is why good piling starts with a geotechnical survey of the site and a piling plan based on actual loads. As an ISO-certified full-service contractor, we can combine piling with sheet piling, excavation, concrete works and injection in one project.
Around 26,000 metres of concrete piles and around 15,000 metres of drilled steel piles, together with ground stabilisation and sheet piling.
Full responsibility for foundation and piling, involved from the design stage.
Test piling that showed concrete piling was the best option, plus sheet piling.
When the ground under the building cannot carry the loads, for example clay, fill or other soft ground prone to settlement. A geotechnical survey shows whether piling is needed.
That depends on the ground. Piles go down to a load-bearing layer or to bedrock, and the length can vary a lot between two sites.
It depends on the number of piles, pile type and length. Length matters most. If the piles are 20 metres instead of 12, the cost of the foundation can double. Contact us with your survey and piling plan and we will price the project.
Contact us early and we will help you choose the right pile type and length.